NOTE: THIS PAGE IS FOR DEMONSTRATION PURPOSES ONLY

 
Spacer_Gold.png
 

WELCOME HOME, JANE

PROJECT STATUS

 
Project Status Icon Bar 3_Rendering.png

A NOTE FROM Levi AUSTIN

We’re so excited to see Chloe’s nursery come to life and look forward to any potential next steps.

NEXT STEPS

Review your high-resolution 3D rendering and let us know which service level you’d like to move forward with. We recommend full service design (and are day dreaming about that light fixture).

 
 
Arrow Down_Small.png
 
 
 
Line_ Gold Small.png
 
 

Inspiration board: option 1

“…PARISIAN CAROUSEL MEETS CIRCUS ANTIQUERIE…”

 
 
Gold Line_Small.png
 

INSPIRATION

Paris is an enchanting city filled with carousels, history, and beauty. As the locals walk their dogs or feed the birds with a crisp baguette, the sweet sound of joyous children laughing echos in the distance as their hands grip the carousel poles and the horses whirl round and round.

COMPONENTS, TEXTURES & LAYERS

Chloe’s space should be a whimsical retreat, centered around the functionality and mainstays every nursery necessitates. The Parisian theme comes to life with a smokey, yet playful, silhouette-style mural setting the tone of the room.

To create the nursery of your dreams, we’ll layer soft textures and details including: a sheer canopy (encompassing a cloud-inspired baby mobile), plush seating (to hold, feed, and rock Chloe) and curated hardware - simply to accentuate the theme of the room. A plush geometric, pastel toned rug paired with a feint peach wall color creates a relaxing space for her to grow. A subtle linen textured wall treatment adds sophistication and dimension.

 
 
 
 
Line_ Gold Small.png
 
 

Inspiration board option 2

“…nouveau riche patisserie at the cusp of dawn…”

 
 
Line_ Gold Small.png
 

INSPIRATION

When you conjure a Paris fantasy, it’s impossible not to think of a quaint bistro. We’ll ditch the kitsch, but lean into the the ambiance of history, comfort, and classic French design to create a layered and sophisticated nursery with international flare. It’s sure to keep Chloe dreaming.

COMPONENTS, TEXTURES & LAYERS

The magic of historic streets will be featured in your subtle faux-plastered walls, with a custom awning-style canopy above Chloe’s confectionary-inspired crib. Your floor to ceiling windows will be adorned by striped curtains and a tile-inspired rug grounds the space. Marble, mercury glass, and brass finishes add luxury and timelessness, but are softened with your plush rocker-glider inspired by a classic bistro chair.

We’ll create a large chalkboard with custom message in homage to the classic menu board. And layer in topiaries and peonies for soft, sweet texture.

Gold Line_Small.png

Design Option 1

High-Resolution 3D Rendering

“Parisian Carousel meets Circus Antiquerie”

Chloe’s space should be a whimsical retreat, centered around the functionality and mainstays every nursery necessitates. The Parisian theme comes to life with a smokey, yet playful, silhouette-style mural setting the tone of the room.

Line_ Gold Small.png

DESIGN HIGHLIGHT

A CUSTOM LIGHT INSTALLATION

A ONE-OF-A-KIND ostrich feather Chandelier

While the large-scale art sets the stage, the most impressive element in this room’s design comes in through in the lighting. The room is beautifully illuminated with a custom, ostrich feather chandelier - a ceiling installation featuring blush pink, champagne, and pale grey ostrich feathers scattered on a dimmable LED backlit panel.

“It’s a beautiful centerpiece in the room that ‘wows’ your friends and family when they visit your beautiful baby girl.”

 
Our Recommendation_Complete Design Service Includes.png
 

NEXT STEPS

Select your level of service:

Icon_Product Sourcing.png

Product
Sourcing

This allows you to place orders at your own pace. We provide three (3) options for every item in your high-resolution 3D rendering, sourcing items within your overall budget for one flat, fixed rate.

This service includes two rounds of review and approval for item sourcing. Levi Austin Design would note the pieces we’re able to fabricate in-house (including art pieces and customized furniture).

icon_Installation & Staging.png

Installation &
Staging

Once you’ve ordered and received all of the furniture and accessories, we offer installation services for your every need. This could include any larger painting projects, large scale wall art (murals), and furniture assembly and customization.

Because we work with high-resolution 3D rendering, our teams installation process is much faster and aligns with the already approved vision.

Icon_Full Service Design.png

Full Design
Service

We believe the process should be as seamless as possible. Periodically, leading up to the installation we discuss finishes, accents, and details that will make your home exactly what you want it to be within your budget.

The full design service includes two complimentary rounds of product sourcing, choice of a custom items (e.g., original artwork or customized furniture), and installation fees allocated within the overall budget.

 

To discuss next steps, contact your designer directly via email, phone, or text. For more information about our services, view or download the LAD Service Comparison .PDF here:

 
 
 
Spacer_Gold.png
 

 Jane’s Profile

NOTE: THIS PAGE IS FOR DEMONSTRATION PURPOSES ONLY

 

NAME Jane Smith

ADDRESS 123 Merry Lane
New York, NY 10001

PHONE (123) 456 - 7890

EMAIL jane@janesmith.com

ROOM(S) Child’s Nursery

OVERALL BUDGET $8,000

NOTES
Owns a pug named Barbara
Works 10 - 7 Monday - Friday

 

Key Design Elements

The inspiration comes from the parent’s trip to Paris and one of Jane’s favorite dolls growing up. A french doll with a simple beret, a beautifully textured dress acts as a starting point for this nursery’s design.

Room Functionality

The most important thing you can do in creating this space is to design a nursery that makes you smile, relax and enjoy. After all, you’re going to be spending a lot of time in the room tending to the newest addition to your family.

 

Shared photos

 
 

Design DOCUMENTS & RECEIPTS

Important information, all in one place, for your convenience:

 

DESIGN

Inspiration Photo (PNG)

COMPONENTS & TEXTURES (PNG)

3D Rendering, Angle 1 (PNG)

3D Rendering, Angle 2 (PNG)

3D Rendering, angle 3 (PNG)

 

FINANCIAL

Initial Design Proposal & Estimate (PDF)

Final Invoice (PDF)

Sourcing Guide (PDF)

Installation Proposal (PDF)

Full Design Proposal (PDF)